Project details
| Status | Upcoming: in preconstruction, drawings issued for construction 23 July 2026 |
| Type | Tenant improvement, commercial fit-up for Liberty Tax |
| Scope | Construction management, fixed-fee CM agreement |
| Address | 55 Waterford Green Commons, Unit B9, Winnipeg |
| Storeys | 1 |
| Floor area | 1,345.5 SF |
| Demising walls | Existing: 4-hour masonry and 1-hour steel stud, kept as they are |
| Service | Tenant fit-up in Winnipeg |
A tax office inside existing walls
Unit B9 at 55 Waterford Green Commons is 1,345.5 square feet of ground-floor commercial space, and Summit Design Build is fitting it out for Liberty Tax under a commercial construction management agreement on a fixed fee. The drawings were issued for construction on 23 July 2026, and the building permit application followed in early September.
The plan is a public-facing office: a waiting area at the entrance, an open office, a lunch room, a universal toilet room and an electrical and transformer room. Every wall that matters is already in place, so the job is about what happens inside them.
What the drawings settle
- Demising walls kept as they are: the existing concrete masonry demising wall is rated 4 hours (ULC U901, STC 50), and the existing steel-stud demising wall is rated 1 hour (ULC W415, STC 51: 2×6 metal studs at 24 inches, 6 inches of acoustic mineral wool, 5/8-inch Type X drywall both sides)
- New partitions: 1-hour walls (STC 36) of 2×4 studs at 16 inches with 5/8-inch Type X both sides, and 30-minute walls (STC 32) with ½-inch drywall
- Life safety: emergency battery packs with pictogram exit signs and double heads, and commercial-grade carbon monoxide detectors on dual power
- Ceilings and power: 2×4 acoustic ceiling tile, dedicated microwave and fridge receptacles, quadplex and voice and data outlets
- Doors: hollow metal, 45-minute rated, at the electrical room
The numbers
| Unit | B9, 55 Waterford Green Commons |
| Area | 1,345.5 SF |
| Type | Tenant improvement, commercial renovation |
| Contract | Summit Commercial CM Agreement, fixed fee |
| Agreement | 29 June 2026 |
| Drawings issued for construction | 23 July 2026 |
| Tenant | Liberty Tax |
| Status | Upcoming; in preconstruction |