Offices
Open plan, private offices, meeting rooms and reception.

Commercial design + construction
Your space. Ready for business.
Design, permits and construction with one team. Start with a free walk-through. Within three business days of the visit, you'll receive a ballpark budget, a timeline to opening and a permit list.
For tenants, landlords and property managers, before or after you sign the lease.
Fit-ups often slow down in the gaps: between the designer and the contractor, or between the drawings and the permit. We close those gaps by doing all three. Our design team lays out the space, we prepare the permit application, and we build it, with one project lead from the first visit to handover.
Choose the contract that suits you: one fixed price for the job, or construction management where you see every trade price and keep control of the budget. Already have drawings from your own designer? We'll price and build from them.
We also manage commercial property, so landlord approvals, base-building rules and tenant improvement allowances are familiar ground.

Current project
A franchise office fit-up for Unit B9, delivered under a fixed-fee commercial construction management agreement.
We've also prepared a schematic plan and preliminary budget for a property manager readying an office unit for lease.
The walk-through is most useful before the lease is final. It gives you real numbers to bring to the conversation with your landlord.
Many landlords contribute toward improvements. A ballpark budget shows how far an allowance will go and what's left for you to cover.
We check what the space already has, such as heating and cooling, electrical capacity, washrooms and sprinklers, so you know what still needs to be added.
A unit that looks ready can still need permits, code upgrades or new services for your use. We'll tell you what applies.
This is construction advice, not legal advice. Your lawyer or broker should review the lease itself.
From a small office to a full restaurant. If your use is changing, for example from retail to clinic, we handle the change-of-use permit too.
Open plan, private offices, meeting rooms and reception.
Exam rooms, plumbing and accessibility.
Storefront, display areas and stockroom.
Built to your brand standard.
Kitchen, ventilation, washrooms and seating.
Warehouse offices, shop space and change of use.
We visit the space. Budget, timeline and permit list follow within three business days.
We draw the space, or build from your designer's drawings.
We apply for the building permit and coordinate landlord approvals.
Fixed price or construction management, on a CCDC contract.
Final inspections and the occupancy permit. Ready to open.
Usually both, in a split set by the lease. Landlords often contribute a tenant improvement allowance and the tenant covers the rest. A ballpark budget before you sign helps you negotiate from real numbers.
Almost always, for new walls, plumbing, electrical, heating and cooling, or a change in how the space is used. Commercial alterations in Winnipeg also need a Commercial Alteration Design Summary with the application. We handle both.
It depends on the size of the space, the permit and long-lead equipment. Your walk-through summary includes a timeline to opening for your space.
Yes. We schedule noisy work, shutdowns and deliveries with the landlord and neighbouring tenants.
Yes. A schematic plan and preliminary budget help you market the unit and set the allowance with real numbers.
Tell us about the space. We'll reply within one business day to arrange a visit. Within three business days of the walk-through, you'll receive: