299 & 301 Oakview

Two new houses under construction side by side on Oakview Avenue, one clad in white board-and-batten siding with black windows, the other in stucco with scaffolding
Photograph: both houses under construction

Project details

StatusOngoing: in construction, building permits issued 9 March 2026
TypeTwo houses with secondary suites (2-4 units)
ScopeConstruction management, CCDC 5B-2010
ClientCatalyst Community Capital
Address299 & 301 Oakview Avenue, Winnipeg
Storeys2 plus basement
Units4
Floor area4,322 SF
Lots2 lots, each 25 ft × 100 ft
ServiceSmall multi-family construction in Winnipeg

Two 25-foot lots, four doors

299 and 301 Oakview Avenue are two adjacent lots, each 25 feet wide and 100 feet deep, 2,500 square feet apiece. On each, the house covers 29.6% of the lot, with two parking stalls off the public lane at the rear and a garbage enclosure beside them.

Summit is construction manager under a CCDC 5B-2010 contract for Catalyst Community Capital. The City issued a building permit for each house on 9 March 2026, and rear deck permits followed in April. The project is in construction: in the photograph, both houses are framed and windowed, one clad in board-and-batten and the other being finished in stucco.

Site plan drawing of one of the two 25 by 100 foot lots on Oakview Avenue, showing the house, rear parking off the public lane and a garbage enclosure
Drawing: site plan of one of the two 25 by 100 foot lots, September 2025 set

One footprint, two arrangements

Each lot gets a new single-family house with a secondary suite, and the two are laid out differently.

  • 299 and 299A: a 1,421 SF house on the main and second floors, with a 740 SF secondary suite in the basement
  • 301 and 301A: a 1,480 SF house on the main and lower levels, with a 681 SF secondary suite on the second floor

Both add up to 2,161 SF, plus a 22 SF covered front entry. Rear decks were permitted separately in April: an 18 by 5 foot multi-level deck at 299, and at 301 an 18 by 5 foot main-level deck with an 18 by 5 foot balcony above it.

Drawing of the front elevations of the two houses on Oakview Avenue side by side, one hip-roofed with stucco and a dark panel, the other gabled with board-and-batten siding
Drawing: front elevations of the two houses, September 2025 set

How it’s built

  • Cast-in-place concrete piles under an 8-inch poured foundation wall, reinforced with 15M bars at 30 inches vertically, on a 6-inch void form
  • Foundation wall insulated to R22 on the inside, with damp-proofing outside and a 6 mil poly vapour barrier
  • Pre-engineered roof trusses at 24 inches on centre, R50 insulation, 7/16-inch OSB sheathing with H-clips and a 6 mil poly vapour barrier
  • 2×6 studs at 24 inches on centre with R22 insulation in the tall walls
  • 5/8-inch Type X drywall wherever a 45-minute fire-resistance rating is needed, including the rim joist detail where a wall sits closer than 4 feet to the property line
  • A 12-inch second-floor cantilever detailed for a 45-minute rating, with 7½ inches of R28 EPS in the soffit and 5/8-inch Type X drywall
  • Two different faces on the same 26 ft 3 in height: one house in acrylic stucco (43% of the front elevation) with a Hardie board panel (21%) under a hip roof, the other in board-and-batten (42%) with Hardie lap siding (22%) under a gable. Windows are 26% of both
Construction details drawing for the Oakview houses showing the piled concrete foundation wall, insulated roof assembly and second-floor cantilever
Drawing: foundation, roof and cantilever details, September 2025 set

The details drawing is worth a look. On a 25-foot lot the walls sit 3 to 4 feet from the property line, so the fire-resistance details carry real weight.

The numbers

299 & 299A301 & 301A
Lot25 ft × 100 ft, 2,500.5 SF25 ft × 100 ft, 2,500.5 SF
House1,421 SF, main and second floor1,480 SF, main and lower level
Secondary suite740 SF, basement681 SF, second floor
Building permit26-115272, issued 9 March 202626-115315, issued 9 March 2026
Rear deck permit26-137326, issued 17 April 202626-137168, issued 24 April 2026
Lots2
Dwelling units4
Total permitted area4,322 SF (plus 2 × 22 SF covered entries)
ContractCCDC 5B-2010, Construction Management Contract for Services and Construction
Delivered forCatalyst Community Capital
StatusIn construction; permits issued March 2026